CANNAFLOORS COVE BASE RESIN

Cannafloors Cove Base Resin is a two component, cycloaliphatic coating for building cove base. Its chemistry provides excellent bonding characteristics. Cannafloors Cove Base Resin is designed for easy cove base installation and easy mixing. Each kit is pre-measured, mix together the two components and add the recommended amount of silica sand to achieve the perfect mix for troweling cove base. Cannafloors Cove Base Resin is specially designed to give the throwel a ball bearing effect and glide smoothly across the base for consistently percfect cove base.

ADVANTAGES

• Essentialy Ordorless
• VOC compliant
• Ball Bearing Effect
• No amine blush
• Commercial kitchen approved
• Easy to mix kits
• Easy install
• Chemically Resistant
• Seamless flooring system

APPLICATIONS

• Cultivation
• Manufacturing
• Distribution
• Indoor / Exterior
• Production

COLORS

Cannafloors Cove Base Resin is available in clear only

PRODUCT DATA

Part A Part B
Unit 1 Kit Pre-measured Pre-measured
Volumetric Ratio Pre-Measured Kits
Solids 100% (+ or - 1%)
Coverage 35-50 LF (Based on 6in cove)
Application temperature 60-90°F
Thinning Not required
Pot life 10-15 minutes
Working time on floor 20-30 minutes
Cure time 6-8 hours (walking)
24 hours (traffic)
Critical recoat time 24 hours
Shelf life 12 Months
USDA Food & Beverage Meets Requirements

PHYSICAL PROPERTIES

PROPERTY VALUE REFERENCE
Compressive Strength 7,800 psi ASTM C 579
Flexural Strength 3,700 psi ASTM D 790
Tensile Strength 3,900 psi ASTM D 638
Bond to Concrete 350 psi
Concrete fails at this point
ASTM D 4541
Taber Abrasion 75-80mgs. ASTM D 4060
Flammability Self Extinguishing
Hardness, Shore D 84 ASTM D 2240
Flash Point >200°F

PACKAGING

Cannafloors Cove Base Resin consists of: Cannafloors Part A Resin and Cannafloors Part B premium hardener.

Part A Part B
Unit 1 Kit Pre-measured Pre-measured

MIXING

The ratio of CANNAFLOORS Cove Base Resin is a pre measured kit designed for easy mixing and application. Part A pail has extra room to accomadate mixing the Part B & the desired amount of sand or color quartz. Mix the following with a drill and mixing paddle. Note: If using a drill mixer, use a low speed (not to exceed 300 rpm) to prevent air entrapment.

1. The Unit 1 kit allows the Cannafloors Part A container to be used as the complete mixing container. Add entire contents of the Cannafloors pre-measured Part B and mix for 2-3 minutes.
2. Next add 2-3 gallon of silica sand (20-30 grit recommended) or color quartz and mix for 2 minutes. Make sure to move mixer up and down to ensure a uniform mixture.
3. Cannafloors Cove Base resin is designed to be immediately troweled on the cove base. Leaving mixed product in the container will greatly reduce working time. Once poured out on the floor, 20-30 minutes of working time can generally be expected.

CONCRETE PREPARATION

Before coating is applied concrete must be:
• Dry - No wet areas
• Clean - Contaminants removed
• Profiled - Surface etched
• Sound - All cracks and spoiled areas repaired

Mechanical preparation is the preferred method of preparing concrete coating application.Shot-blasting, diamond grinding, scarifying and scabbling are all acceptable methods.

TESTING

All surfaces are not the same. it is recommended that a sample area be done before the start of the project. The Test should be done on-site, using the proposed method by the assigned applicator to insure proper adhesion and color. a sample area should also be done on any existing coatings to determine if any contaminants exist or will occur.

APPLICATION INSTRUCTIONS

Required Tools:
Plug drill and proper mixing paddle, 3"x8" trowel works best to apply, margin trowel, and a radius cove trowel minimum of 3/4" but 1" is preferred

1. Always apply in descending temperatures. Concrete is porous and traps air. In ascending temperatures (generally mornings) the air expands and can cause out gassing in the coating. It is safer to apply coatings in the late afternoon, especially for exterior applications.
2. Optimum ambient temperature should be between 65-90°F during application.
3. Pre-primer the area being coved with cannafloors primer / sealer
4. MIx the Pre-measured kit using above mixing instructions.
5. Use a minimum of a 3/4" radius cove trowel and finish cove base. Any smaller may result in a loss of the radius once the floor is tied in.
6. Carefully remove tape and finish rough edges.

WARRANTY

CANNAFLOORS products are warranted for one year after date of application. Please refer to the CANNAFLOORS Limited Material warranty for additional clarification.

SAFETY

Consult CANNAFLOORS COVE BASE RESIN safety data sheet. Avoid CANNAFLOORS COVE BASE RESIN contact with skin. Some individuals may be allergic to Resin. Always wear protective gloves, eye wear and clothing.